描述
物理参数
颜色: Iron red, grey, clear (specialized floor primer colors, customizable upon request; iron red focuses on rust prevention, clear is ideal for light-colored topcoats)
光泽: Matt, Semi-matt (matt by default to prevent primer reflection from affecting the topcoat appearance)
标准膜厚度:
湿薄膜厚度(WFT): 80 μm
干膜厚度(DFT): 30μm
理论上传播率: Approx. 6.5 ㎡/kg
闪点: 28°C
密度: Approx. 1.20 g/cm³ (after mixing the two components)
应用程序的说明
混合比例: Base : Curing Agent = 4 : 1 (by weight)
Pot Life (23°C): 2小时
稀释剂: Epoxy Floor Primer Dedicated Thinner (Note: The use of general thinners is strictly prohibited as it will degrade the film’s adhesion and penetration. Add only in small amounts during application when substrate porosity is excessively large.)
清洁剂: Epoxy Floor Primer Dedicated Thinner. Clean all tools immediately after use to completely remove residual paint, preventing cleanup difficulties caused by product curing. Application tools must be kept dry and clean; avoid moisture contamination to safeguard paint performance.
应用的方法: 无空气喷洒,常规的空气喷洒,或者刷/罗涂层。
喷参数
| 参数 | 无气喷雾 | 常规的空中喷雾 | 刷/滚 |
| 喷嘴/尖端的尺寸 | (Graco) 163T-621/623 | 1.5 ~ 2.5 mm | — |
| 流体压力(MPa) | 20 ~ 45 | 0.30 ~ 0.50 | — |
| 疏比 | 0 ~ 5% | 5 ~ 12% | 5 ~ 12% |
Note: Application data are for reference only. Practical adjustments can be made based on substrate smoothness, porosity, and ambient temperature. The primer coat must be hard dry before applying the intermediate coat. Hard dry time varies with ambient temperature, typically taking 8 to 24 hours.
Drying Time & Full Curing Time
| 基Temp. (°C) | Surface Dry (min) | 硬干(h) | Full Curing Time (h) |
| 5 | 120 | 24 | 72 |
| 15 | 80 | 12 | 48 |
| 25 | 40 | 6 | 24 |
| 35 | 25 | 4 | 16 |
表面准备
Concrete Substrates: The substrate surface must be clean, dry, and completely free of oil stains, dust, laitance, and loose material. Concrete substrates must be abraded to remove laitance and loose layers, exposing a solid base with a surface roughness of $\text{Ra}\,3.2 \sim 6.3\,\mu\text{m}$.
General Requirements: Remove surface dust using a vacuum cleaner or high-pressure air to ensure substrate pores are unblocked. The moisture content of the concrete substrate must be $\le$ 8%, otherwise it can easily cause film blistering and flaking.
Overcoating: When overcoating existing epoxy floors or cement grounds, the old surface must be abraded and roughened to eliminate chalked or loose areas. Clean thoroughly before primer application to ensure optimal adhesion between the new film and the old substrate.
应用程序的条件
温度及湿度: The application temperature range is 5 ~ 35°C with a relative humidity (RH) below 80%. The substrate surface temperature must be at least 3°C above the dew point. All measurements of temperature and humidity must be taken close to the substrate in the application area.
High-Temperature Constraints: Coating operations are not recommended if the substrate surface temperature exceeds 40°C, avoiding film defects like pinholes, wrinkling, or incomplete curing.
Adverse Weather & Ventilation: Do not apply outdoors or in poorly ventilated indoor areas during rain, snow, high humidity, or heavy fog. The application environment must maintain excellent ventilation to prevent solvent vapor accumulation, while measures should be taken to stop dust from settling onto un-dried film surfaces.
涂层系统的兼容性
Preceding Preparation: Concrete substrate abrasion, dust removal, and drying treatment; steel structure substrates must undergo rust removal to reach at least Ah3 等级。
Subsequent Coats: SH-E2001 Epoxy Floor Intermediate Coat, SH-E2002 Epoxy Floor Topcoat, or SH-E2003 Epoxy Self-Leveling Topcoat. Using these in combination creates a complete epoxy flooring system. Select the corresponding subsequent coating based on operational needs (heavy-load, cleanroom, anti-corrosion) to maximize overall floor performance.
包装的规格
基地(A部分): 20公斤
固化剂(B部分): 5 kg
储存
Store this product in a cool, dry, and well-ventilated indoor warehouse, away from open flames and heat sources. Avoid direct sunlight.
Do not store together with acidic, alkaline, or oxidizing substances. The shelf life is 12个月 under normal room temperature (5-30°C) conditions. After expiration, the product can still be used if it passes inspection for all technical specifications.
The base and curing agent must be stored separately. Once opened, the product should be used as soon as possible; any unused portion must be tightly sealed and stored to prevent moisture absorption, curing, or contamination that compromises adhesion and penetration.
安全预防措施
All sources of ignition and smoking are strictly prohibited at the mixing and application sites. Maintain excellent ventilation to reduce paint mist concentration and avoid the inhalation of harmful components (confined space application requires specialized extraction and respiratory equipment).
Applicators must wear appropriate personal protective equipment (PPE), including protective masks, safety goggles, and solvent-resistant gloves to avoid paint mist inhalation or eye and skin contact.
If paint contacts the skin, wash immediately with soap and water or a specialized skin cleanser. If it splashes into the eyes, rinse continuously with plenty of water for at least 15 minutes and seek immediate medical attention.
Warning signs must be placed around the application area to restrict unauthorized entry. Clean up and collect residual coatings and thinners promptly after construction for centralized disposal; dumping at will is strictly prohibited to prevent environmental pollution.
免责声明
保护性能的任何涂层在很大程度上取决于应用程序因素。 表面准备和薄膜厚度将会直接影响到服务的生活的涂层。 用户必须确保遵守规定的应用条件。
提供的数据,在这本手册是理论上的价值或来源于实验的积累。 一些数据可以改变由于持续的产品的改进,无须事先通知。
当我们的公司的技术人员都是不存在的应用程序的网站,该公司承担全部责任的质量的涂料产品本身。